top of page

First Class Delivery

The Hyde delivery office in Colindale, London is a very busy site, with requirements for constant access to the delivery yard and customer car park. Mulberry delivered car park with a redesigned traffic flow, providing a safer environment and increased car parking spaces.

Mulberry carried out a site survey and condition report that detailed site defects and highlighted the required repair design.

The delivery office is in a built-up residential area and the Royal Mail team delivered letters to all local residents detailing the essential repairs and how Mulberry were taking steps to carry out the works during daytime hours on Sundays to minimise the impact of the project.

Mulberry engaged the local authorities environmental health officer and highways departments to inform them of out-of-hours weekend works and traffic management plans for vehicles and pedestrians.

         Services Provided                             Location                                    Duration

Surveying
Professional Design Advice and Specification
Tanker Assisted Drainage Cleanse
Civil Engineering
Traffic Management
Asphalt Surfacing
Line Marking

London

2 Days

bottom of page